Skip to content
GPUS-IT Infrastructure Portal
GCP VM Build SOP
Initializing search
Home
Guides
Governance
Priorities
Architecture
Infrastructure
Platform Services
Host Registries
Security
Compliance
Response Plans
Incidents
Change Management
Access Control
SSO & Identity
GPUS-IT Infrastructure Portal
Home
Guides
Guides
Travel Request — Submitting
Travel Approval — SMT
Travel Approval — Coordinator
Travel Approval — Final Approver
Governance
Governance
Forms Portal Field Audit
Forms Field Audit — IT Review — 2026-08-04
Cross-Department Field-Exposure Matrix
Component Coverage Standard
Inventory Schema
Adding New Infrastructure — Quick Start
WDC Office Power & Rack Walk-Around — 2026-05-13
Governance & Tracking-Gap Register
Register ID Mapping — 2026-08-13
Session Handoff — 2026-09-09
Priorities
Priorities
GPUS IT Priorities
Session Log
Flag List — Unverified Done Rows (2026-08-13)
Backlog — Enumeration Sessions (2026-08-17)
Architecture
Architecture
Overview
WDC On-Premises
WDC On-Prem (detail)
WDC On-Prem (detail)
Overview
Hypervisor — Water Rebuild
Power — APC UPS / PDU / Strip Inventory
Backup — Snapshot Schedule
GCP Cloud
Cloud Servers
GCP VM Build SOP
BigQuery Billing Export
Forms API Contract
Forms Frontend Design Spec
Forms Phase 2 Deploy
Forms Phase 2.5(a) Design
Forms Phase 2.5(b) Design
Forms Phase 2.5(c) Design
Infrastructure
Infrastructure
DNS & DHCP (SKY/RAIN)
Monitoring (SUN)
Logging (WIND)
Cloud VMs (OAK/MAPLE/CEDAR)
GPUS-IT-Infrastructure (Data-Team GCE)
Status Dashboard
SOC Dashboard
Forms Portal — forms.greenpeace.us
Meraki Network
Runbooks
Runbooks
Post-Change Checklist
DNS Failover Procedure
Server Rebuild
Backup & Restore
Forms DB Access & Break-Glass
Platform Services
Platform Services
Travel Approval Workflow
Travel Approval — Workstream Close-out
Host Registries
Host Registries
Overview
WDC Linux
GCP Cloud
Meraki Network
Security
Security
Defense in Depth
CIS Controls v8
PCI DSS Compliance
Threat Management
Risk Analysis
Vulnerability Tracker
ASVS L2 Scope — Forms Approval Workflow
VLN-009 — WDC Passwordless Sudo (2026-08-05)
VLN-010 — Wazuh LOLBin Baseline Rules Inert (2026-08-05)
VLN-011 — Forms HappyFox Dispatch Never Ran (2026-08-06)
VLN-053 — CEDAR Indexer Unauthenticated (2026-09-08)
VLN-054 — Webmin Reachable Only From The Connector (2026-09-08)
BT-001 LOLBin Drill
BT-003 Ransomware Drill
IR-001 Ransomware Incident
Compliance
Compliance
Program Overview
Information Asset Registry
Forms Portal — Compliance Controls
Policies
Policies
Acceptable Use Policy
Data Classification Policy
Access Control Policy
Change Management Policy
Incident Response Policy
Backup & Recovery Policy
Response Plans
Response Plans
Disaster Recovery Plan
Incident Response Plan
Incident After-Action Review
Forms Portal — IR Playbooks
Forms Portal — DR Playbook
WDC On-Prem — IR Playbook
WDC On-Prem — DR Playbook
Incidents
Incidents
WDC HVAC/UPS Cascade — 2026-05-09
Change Management
Change Management
Overview
Change Management Policy
Change Procedure
Change Log
Standard Change Templates
Access Control
Access Control
Overview
Access Control Policy
Role & Permission Matrix
Account Provisioning
Privileged Access Management
Access Review
2026-04 Meraki Admin Review
SSO & Identity
SSO & Identity
Okta Integration
GCP VM Build SOP
¶
Back to top